A stage-by-stage checklist from concept through post-occupancy, aligned to CIBSE Code M and the way handovers actually get certified in Australia.

Stage 01

Concept & briefing

  • Owner’s Project Requirements documented and signed
  • Commissioning strategy drafted and budgeted
  • Independent commissioning agent appointment scoped
  • Seasonal / post-occupancy commissioning allowed for in the contract
Stage 02

Design

  • Commissionability review of every MEPF system
  • Test ports, valves, access and metering confirmed on drawings
  • Performance criteria and acceptance tolerances defined
  • Witnessing regime agreed with the client
Stage 03

Procurement

  • Commissioning obligations written into each trade package
  • Specialist commissioning contractors identified
  • Commissioning programme integrated into the master programme
  • Documentation and handover deliverables scheduled
Stage 04

Installation & static completion

  • Installation checks completed and signed by area / system
  • Pipework flushing, cleaning and chemical treatment verified
  • Electrical dead testing and point-to-point complete
  • Static completion certificates issued before energisation
Stage 05

Setting to work & regulation

  • Plant energised under a controlled permit process
  • Air and water systems balanced to design tolerance
  • BMS points proven end to end
  • Controls strategies demonstrated against the design intent
Stage 06

Performance & integrated testing

  • Integrated systems testing (IST) scripts written and witnessed
  • Black start, fire mode and emergency scenarios proven
  • Redundancy and failover demonstrated at full load
  • Defects captured, categorised and closed out
Stage 07

Handover & post-occupancy

  • O&M manuals, as-builts and asset register verified
  • Client and facilities team training delivered and recorded
  • Digital handover pack issued
  • Seasonal fine tuning scheduled for the first 12 months

Free download · PDF · 2 pages

Building Commissioning Checklist

Every stage as a printable PCM-branded PDF for your site and project team.

We'll only use your email to send the guide and occasional PCM updates. Unsubscribe anytime.