A unified strategic dashboard aligning CIBSE Code M milestones, delivery programme, system verification, and Soft Landings into a single commissioning narrative.

PROJECT PROGRESSStage 3 (On-Site) Active
Strategic Core

Commissioning Strategy & Delivery

1. Preparation & Briefing

Setting the Baseline

Establish the project commissioning requirements, success criteria, roles, responsibilities, and initial budgets.

Deliverables Checklist
  • Owner’s Project Requirements (OPR) document
  • Commissioning Scope & Budget definition
  • Appointment of Commissioning Manager (CxM)
  • Initial Commissioning Responsibility Matrix
Smart Data Compliance

Digital Operations Tracker

In compliance with the updated CIBSE Code M guidelines, dynamic metadata specifications, naming standards, and network telemetry loops must be audited prior to final dynamic functional balancing.

Verify Phase Check:Review whether your telemetry variables comply with operational building standards.
PCM Engineering Tools

Engineering Sizing & Verification Hub

Professional building services calculators to verify design parameters, size distribution systems, and audit commissioning performance.

Sizing & Verification Modules

Configuration Inputs

1,000 L/s
5.0 m/s

Sizing Selections & Outputs

Round Size
Selected Diameter600 mm ØExact calculated: 504.6 mm
Rectangular Size
Selected Dimensions700x300 mmExact calculated width: 666.7 mm

Calculated values are aligned with standard temperature air/water densities under CIBSE and ASHRAE commissioning frameworks to provide realistic engineering baselines.

Request Verification Support
Air Distribution Audits

Air Distribution Audits

Commissioners audit ductwork systems to verify structural integrity, perform duct leakage testing (Duct Leakage Class), and verify that static pressure drops do not exceed fan design limits.

On-Site Field Audit